11

November 23, 2015 7:55 pm Published by Leave your thoughts

On November 23, 2016 milestone of Engine Start-up of semi-submersible drilling rig owned by “Azerbaijan Rigs” LLC has been completed.

While the testing due to the milestone achievement, all 4 engines were started individually and each of them was run for 5 minutes. Purpose of the test was just to start the engines and alarm testing, interface testing, load testing and parallel testing started afterwards.

Categorised in:

This post was written by rigs_admin

Leave a Reply

Your email address will not be published. Required fields are marked *